The story appears on

Page A4

April 17, 2015

GET this page in PDF

Free for subscribers

View shopping cart

Related News

Home » Metro » Public Services

Nanpu Bridge off limits

NANPU Bridge will be closed for five hours tomorrow morning for maintenance checks, the city’s traffic authority said yesterday.

Engineers will carry out an inspection and run various tests between midnight and 5am, the Shanghai Transportation Commission said on its official microblog.

Diversions will be in place for the duration of the closure, which is the first in the bridge’s 23-year history, it said.

Nanpu Bridge, which opened in November 1991, was built to carry about 30,000 vehicles a day, though the actual figure is now nearer 120,000.

As a result, the cable-stayed structure, which spans the Huangpu River, needs to be assessed to ensure its safe operation, the commission said.

As well as the closure of the main body of the multi-lane bridge, and its entry and exit ramps in Puxi and Pudong, a section of the approach road between Xizang Road S. and the Longyang Road elevated road will be off limits to traffic for the five-hour period.




 

Copyright © 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.

沪公网安备 31010602000204号

Email this to your friend