The story appears on

Page A12

August 18, 2017

GET this page in PDF

Free for subscribers

View shopping cart

Related News

Home » City specials » Hangzhou

Line 2 work finished soon

The Fengtan Road-Liangzhu Road section of Metro Line 2 totaling 10 stops, will be ready for trial operation by the end of this year.

The 10 stops will include Fengtan Road, Wenxin, Sanba, Xialongxu, Sandun, Dunxiang Street, Jinjiadu, Baiyang, Dufu Village and Liangzhu stops. In the future, passengers can transfer to Metro Line 5 at Sanba and to Line 4 at Jinjiadu.

The construction of the 10 stops has finished the main structure and is now at the stage of building attached structures including the air shaft and laying the tracks. Next, electromechanical equipment and devices will be installed in the tunnels and stations.

Hangzhou is accelerating construction of its Metro system as the city plans to build a Metro network totaling 446 kilometers by 2022.




 

Copyright © 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.

沪公网安备 31010602000204号

Email this to your friend